Construction scope: Floor renovation using PU-based floor coating. Product used: MC-DUR 230. Location: Binh Duong Province. Implementation period: 2026.
Pham Nguyen Confectionery and Food Processing Co., Ltd. Factory
Solution applied: Industrial floor coating. Project scope: Floor renovation. Product supplied: MC-DUR 230. Implementation period: 2026.
Ben Thanh – Can Gio Railway Line
Project overview: The Ben Thanh – Can Gio railway line is a major, key transport infrastructure project for Ho Chi Minh City, connecting the central Ben Thanh area with Can Gio. Spanning approximately 54 km, the line features a double-track, electrified…
Gia Binh International Airport
Project introduction: Gia Binh International Airport is a key national dual-use airport mega-project located in Bac Ninh Province. Solution applied: Concrete admixtures. Product supplied: MC-PowerFlow 2132. Implementation period: 2026.
Hanoi Olympic Sports Urban Area (Vinhomes Olympic)
Project introduction: The Hanoi Olympic Sports Urban Area (Vinhomes Olympic) is a mega-scale sports urban development spanning 9,000 to 16,000 hectares, with a total investment exceeding VND 925 trillion, developed by Vingroup. Solution applied: Concrete admixtures. Products supplied: MC-PowerFlow 2135 MC-PowerFlow…
Vinhomes Spring Town (Vinhomes Mỹ Lâm)
Project introduction: Vinhomes Spring Town (also known as Vinhomes My Lam) is a mega-scale hot spring resort and golf course township developed by Vinhomes in My Lam Ward, Tuyen Quang Province. Solution applied: Concrete admixtures. Products supplied: MC-PowerFlow 2135 MC-PowerFlow 2252…









