MC-BIFI BAUCHEMIE VỮNG TIN - XÂY GIÁ TRỊ - DỰNG NIỀM TIN

Liên hệ
Location
814/3, Đường Láng, Phường Láng
TP. Hà Nội.

MC-Floor 1011

High performance two-component water-based Epoxy floor coating.

  • PRODUCT PROPERTIES:

➢ High-quality, two-component, water-dispersed modified amine epoxy floor coating.
➢ Forms a hard, abrasion-resistant coating with an aesthetically pleasing satin-matt finish.
➢ Excellent adhesion to dry or slightly damp mineral substrates (cement-based).
➢ Resistant to water, diluted acids, alkaline solutions, as well as a wide range of organic chemicals.

  • AREAS OF APPLICATION:

➢ Decorative and protective coating for mineral (cement-based) substrates exposed to mechanical and chemical stresses.
➢ Suitable for areas subjected to light to medium mechanical loads.
➢ Recommended for use in manufacturing plants, canteens, electronics and pharmaceutical industries, as well as office buildings and similar facilities.

  • PRODUCT CHARACTERISTICS:
Cleaning agent Water.
Colours Grey, blue, red, yellow, green, etc.

Custom colours available upon request; however, some dark shades may not be suitable for industrial flooring applications. Please contact MC-BIFI for further advice.

Packaging 19.25kg / set.
Shelf life & Storage Can be stored for 12 months in unopened original packaging under cool (below 20°C) and dry conditions. Protect from frost.
Disposal Ensure that single-use containers are completely emptied before disposal, in accordance with local regulations.
  • TECHNICAL DATA:
Characteristic Unit Value Comments
Mixing ratio (by weight) 3 : 8 Base : Hardener
Density g/cm³ ~ 1.3 – 1.4 Depending on colour
Viscosity mPa·s ~ 1.500 At 20°C and 50% RH
Working time minutes ~ 30 At 20°C and 50% RH
Touch dry hours ~ 12 At 20°C and 50% RH
Full cure days 7 At 20°C and 50% RH
Application conditions °C

%

K

≥ 8 – ≤ 30

≤ 85

3

Air and substrate temperature

Relative humidity

Substrate temperature above dew point

Consumption kg/m² ~ 0.15 – 0.3 Per coat

(*)Technical values determined under standard laboratory conditions (21°C ± 2°C, 50% RH). The coverage is theorotical and may vary due to a variety of site conditions.

  • INSTRUCTION OF USE:

➢ Primer: Concrete substrates must be primed with MC-EP Primer W. The primer should be evenly applied using a rubber squeegee and/or a short-pile roller. The use of a transparent primer coat is recommended to optimise adhesion and surface appearance.

➢ Application:
– After the primer has fully dried (waiting time approx. 12 – 48 hours), apply MC-Floor 1011 with a short-pile roller in crosswise directions, ensuring a streak-free finish and adherence to the specified consumption rate.
– Typically, two coats are needed to achieve color uniformity and optimal results. The waiting time between the two coats is a minimum of 12 hours and a maximum of 48 hours.
– Coatings must be applied continuously, efficiently and without forming overlaps or joints.
– To ensure optimal drying: Minimum surface and air temperature: 10°C and permissible relative humidity: maximum 85%.

➢ General information:
– Consumption rate, application time, resistance to foot traffic and time to full cure depend on temperature, environmental conditions and the condition of the substrate on site.
– To ensure colour consistency between different production batches, the instructions in the technical documentation must be observed.
– Exposure to chemicals and UV radiation may lead to colour changes over time; however, this does not generally affect the performance or usability of the coating.
– Surfaces exposed to mechanical and chemical stresses are subject to wear during service. Regular inspections and routine maintenance are recommended.